March to April 2004, runway 07R/25L, area dimension: 135.000m²
12cm asphalt binder course 0/16 S with PmB 45 + 3% Sasobit®, built in two layers.
- Construction: Strabag Brandenburg
- Asphalt supplier: Strabag Brandenburg
During the whole project the runway was completely closed. For this project Sasobit® wasn’t chosen due to the temperature reduction aspects, but mainly due to the increased stability and the improvement of the paving conditions.
The asphalt binder course was finally “sealed” with a 3 mm ANTISKID-coating.
|